Join Our Team

If you are interested in joining the team, please submit us your details below.

send request

LIDL DISTRIBUTION CENTRE

2021 Aug - 2021 Dec

The new warehouse, which is approximately 1,000,000ft², will be Lidl’s largest in the UK at double the size of any of its other warehouses across Great Britain.

The development comprises the construction of a Regional Distribution Centre (RDC) of over  1.2 million sq ft of warehouse floor space, 612 associated car parking spaces, 141 HGV stacking spaces, 196 loading docks, 20 E-charging spaces, a drivers lounge, smoking shelters, two bicycle stores with 104 spaces for bicycles, four haulier cabins, three battery enclosures, a generator enclosure, sprinkler tanks, pump house hydrant tanks, gas and electric substations, 2 bus stops on Woodside Link, and a comprehensive landscaping scheme.

LOCATION:  LUTON | LU4 9TX

CLIENT: BYRNE GROUP

Main Works: Capping Beams; Pile Caps & Ground Beams; Raft Reinforcement Slabs; Columns, Retaining and Core Walls; Slip Forms; Suspended Beams, Suspended Slabs & PT Slabs; Crane Bases, Pile Cages.